Skids, completion equipment, drill pipe, downhole tools moved to Bintulu, Labuan, Lutong and beyond.
Home › Specialist Cargo Handling
Generators, transformers, mining equipment, plant relocations, marine cargo, indivisible loads — the shipments that need a route survey, a permit application and a foreman on site at three in the morning. We have done hundreds.
Every project starts with a brief and a route survey. Where can the trailer turn? Which bridge is rated for the axle load? Where do we need police escort? What is the lift plan at the receiving site? Our coordinators walk these questions through with you before we put a number on the page.
Skids, completion equipment, drill pipe, downhole tools moved to Bintulu, Labuan, Lutong and beyond.
Transformers, switchgear and wind components moved into substations and turbine sites across Peninsular Malaysia.
Crushers, haul trucks, screening plant moved into Pahang and Sarawak with bridge-rating studies.
Production lines disassembled, palletised, shipped and re-commissioned with no production gap counted in weeks.
Heavy lift charters, barge moves, sub-sea structures and oversized hull sections.
Tower cranes, formwork and prefab modules timed against the build sequence on site.
We sit with your project engineer, capture dimensions, weights, lifting points and timing windows.
Physical survey of the full route from origin to destination, with photographs and a written go/no-go report.
JPJ, JKR, PLUS, police and toll concessionaires aligned in advance with documented permits.
Trailers, modular haulers, cranes, riggers and escort crews mobilised against a written timeline.
Supervisor on site at origin and destination. Time-stamped photographs lodged to the booking ticket throughout.
Equipment received by your team, paperwork signed off, project closeout report shared the same week.
A single 386-tonne transformer from Port Klang into a substation in Pahang, using a 24-axle modular hauler with a programmed night convoy and three temporary bypass roads built by the highway concessionaire.
Yes. We work with three independent warranty surveyors and will appoint at your direction or to your insurer’s nomination. Their report is shared with you in full.
Always. Permits with JPJ, JKR, MOTAC and the relevant state highway concession are part of the scope and are listed on the quotation by name and validity date.
Ideally during your tender or pre-FID phase. The earlier we see drawings and site access plans, the more we can engineer cost out and avoid surprises during execution.
Drop your project scope to our operations team and we will respond with a planning call within one working day.